Project Summary Documents
Project Summary Documents (PSDs) are disclosed for each project prior to Board
consideration. They contain project descriptions, financial details, client
information, environmental issues, tender guidelines, and contact details.
PSDs for private sector projects are disclosed at least 30 days prior to Board
consideration and for state sector projects, at least 60 days.
Project Summary Documents
Signed projects
Board approval is the final stage in the project approval process. After Board
approval, the EBRD and the client sign the deal and it becomes legally
binding. Signed project lists reflect year-end data.
Signed projects
(0.1Mb)
Case studies
BTC: Monitoring environmental and social commitments
The EBRD’s €106 million investment in the Baku-Tbilisi-Ceyhan (BTC) oil
pipeline was signed in 2004 but the Bank’s interest in the project did not end
at that point. EBRD staff continue to spend considerable time monitoring
compliance with EBRD policy and international standards and with company
commitments in terms of environmental and social impact.
Experts from the EBRD’s Environment Department make regular and extensive
monitoring visits to the pipeline to assess compliance and progress. On the
environmental front, they have helped to ensure that the highest possible
international standards are adhered to and enforced.
The EBRD has also begun, together with the client company, to deal with the
social impact of the pipeline in a more proactive way. The Bank’s new social
specialist focuses specifically on these kinds of issues. One of these, land
compensation, has been especially problematic in Georgia. This is mostly due
to the complexities of the land registration system in this country and the
fact that pasture lands were not privatised. In fact, 90 per cent of land
parcels have now been compensated although more time will be needed to unravel
the most contentious remaining cases.
The client company is channelling some €25 million to community investment
programmes. These range from the renovation of school buildings to the
establishment of irrigation systems and from local microfinance to sewer
systems.
For example, a project to improve a local school (new roof, new floor and
heating stove) and to construct a water supply system in Samshvilde village in
Georgia, meaning that villagers will no longer have to carry water in buckets
from the local spring, is being funded on a 90/10 per cent basis by the oil
company and the villagers. This is a small investment but it represents a big
improvement – and it is typical of the many small projects that are a direct
result of the pipeline.
Tbilisi airport
On May 17 2006, the Bank signed the Loan Agreement with the TAV Urban Georgia,
a party to the concession agreement with the Tbilisi International Airport
Company. The facility will consist of a loan of USD 27 million to TAV Urban
Georgia a Special Purpose Vehicle, established under Georgian Law, by the
largest Turkish Airport Operator TAV.
The project is co-financed with the International Finance Institute (“IFC”).
The proceeds of the EBRD loan will be used to part finance the construction of
new passenger terminals at Tbilisi and Batumi, together with associated
facilities.
The operation will enable TAV Urban Georgia to facilitate traffic growth and
improve safety. It will contribute to increase of private ownership; given
that Tbilisi International Airport will be built and operated by the private
sector for the life of the concession, and transfer of know-how, which
includes the introduction of more commercial practices.
Key transport projects
Georgian transport infrastructure is in the spotlight as the EBRD also
supports the development of the transport corridor linking eastern Europe, the
Caucasus and Central Asia (TRACECA). Notably, the Bank has already assisted
the commercialisation of Georgian railways through financing the improvement
of the international transit route from Baku to the Georgian ports. The major
infrastructure projects now underway will facilitate the flow of goods to the
ports of Poti and Batumi.