Preparation of the new EBRD Energy Operations Policy
In July 2006, a new Energy Operations Policy was approved by the Board of
Directors. The document sets out the general, specific and operational role of
the Bank in the energy sector and establishes the overall framework for the
Bank's activities over the strategy period 2006-2010.
The policy succeeds the Energy Operations Policy approved by the Board on 21
March 2001, as well as the Natural Resources Policy approved on 23 March 1999.
Invitation to comment
Comments were invited during a period of 45 days. The draft
Energy Operations Policy
(0.5Mb) was a basis on which to comment.
Background documentation
Public consultations
As part of a wide-reaching public consultation process to draft the policy,
the EBRD held consultation workshops in London, Sofia and Moscow. The
consultation workshops were organised with the help of EIR Development
Partners.
Summary of the
consultation workshops
(0.3Mb) including agendas and lists of participants.
Industry and Governmental
Consultation Survey and Key recommendations
(0.7Mb)